Hut 8 Corp.
Expected move
InputsNext report
Last report
Largest filed tie
13F top-10 QoQ
Top fund weight
Last report2 of 8 at or beyond impliedshaded = implied▲▼ = realized× = |realized| ÷ implied
Hut 8 Corp.
Expected move
InputsNext report
Last report
Largest filed tie
13F top-10 QoQ
Top fund weight
Last report2 of 8 at or beyond impliedshaded = implied▲▼ = realized× = |realized| ÷ implied
−9.74%
vs ±15.6% implied · ×0.62
shaded = implied · ▲▼ = realized
Hut 8 has 7 disclosed suppliers and 7 disclosed customers in SEC filings.
Hut 8 Corp.
59.55
SentenceThe initial phase of the partnership is supported by blue-chip institutional counterparties, including Entergy, which will be providing power to the site, J.P. Morgan and Goldman Sachs, who are expected to serve as loan underwriters for the project-level financing, Vertiv, who is the power provider for the site, and Jacobs, who is serving as general contractor.
SentenceThe initial phase of the partnership is supported by blue-chip institutional counterparties, including Entergy, which will be providing power to the site, J.P. Morgan and Goldman Sachs, who are expected to serve as loan underwriters for the project-level financing, Vertiv, who is the power provider for the site, and Jacobs, who is serving as general contractor.
SentenceDuring 2024, we entered into an ASIC colocation contract with Bitmain Technologies Georgia Limited ("Bitmain") to host miners at our Vega site.
HUT 10-Kaccession 0001104659-26-019392
SentenceWe partnered with BITMAIN Technologies Ltd. ("BITMAIN"), the world's leading manufacturer of digital currency mining servers, to develop and launch the U3S21EXPH ASIC miner, an integral input in the design and commercialization of a new ASIC compute data center form factor.
HUT 10-Kaccession 0001104659-26-019392
SentenceOur Bitcoin is held with third-party custodians, Coinbase Custody, NYDIG, Anchorage, and BitGo, which we select based on various factors, including their financial strength and industry reputation.
HUT 10-Kaccession 0001104659-26-019392
SentenceThrough early engagement with Entergy Louisiana, we assumed key interconnection and development functions typically managed by the utility, such as the development of transmission and distribution infrastructure, materially accelerating originally quoted power delivery timelines.
HUT 10-Kaccession 0001104659-26-019392
SentenceWe generate revenue from our 80.1% interest in a joint venture with Macquarie Group Limited ("Macquarie"), a global financial services and infrastructure investment firm, which provides capacity and energy to the electrical grid through four natural gas power plants in Ontario, Canada (the "Far North JV").
HUT 10-Kaccession 0001104659-26-019392
SentenceThe lease has a base contract value of approximately $7.0 billion, with the potential to increase to $17.7 billion through renewal options, and is supported by a financial backstop from Google, which covers the lease payments and related pass-through obligations for the initial 15-year base term of the lease.
Sentencethe Company entered into the Mining MSA, which specified that Hut 8 would manage and oversee certain
aspects of the bitcoin mining business, namely supervision of the construction at the Ward County facility.
IOND S-1/Aaccession 0001185185-26-002919IOND
SentenceIn December 2025, we announced a strategic partnership with Anthropic, PBC ("Anthropic") and Fluidstack Ltd. ("Fluidstack") to develop AI data center infrastructure.
HUT 10-Kaccession 0001104659-26-019392
SentenceIn December 2025, we announced a strategic partnership with Anthropic, PBC ("Anthropic") and Fluidstack Ltd. ("Fluidstack") to develop AI data center infrastructure. As part of the partnership, we entered into a 15-year, triple-net lease with Fluidstack for 245 MW of AI data center IT capacity at our River Bend campus ("River Bend") in Louisiana.
HUT 10-Kaccession 0001104659-26-019392
SentenceBitcoin rewards are received from mining activity through third-party mining pool operators, which allow miners to combine their processing power, increasing their chances of solving a block and getting paid by the network.
HUT 10-Kaccession 0001104659-26-019392
SentencePrior to the sale, we secured five-year capacity contracts with the Ontario Independent Electricity System Operator ("IESO") Medium-Term 2 ("MT2") auction across the portfolio, transitioning the assets from short-term arrangements to long-term revenue commitments.
HUT 10-Kaccession 0001104659-26-019392
Linked news
Expected move
Inputs8Q avg ±11.0%·×0.75·cheap
straddle ±13.5%
spot 59.40exp Nov 6ATM strike 59ATM straddle 9.45IV 144%